info@marqueegoc.com
(905) 829-7984

Marquee Group is excited to share that the Hilton Garden Inn Oakville renovation and expansion project commenced May of 2016.

July 14 2016 003

At present, we are anxiously awaiting the completion of the 4th floor which should be finished by the end of August. With the fifth floor framing completed and the interior drywall underway, we are anticipating that the interior building work should begin shortly for the 1st, and 5th floors.

Each floor will receive a complete refresh with brand new light fixtures, flooring, wallpaper, drapery, furniture, and decor, among others. The existing rooms will undergo a face-lit from the floors to the ceilings. Rooms will have a contemporary and modern feel incorporating different textures, tones and a refreshing colour palette that will create an oasis for both business and leisure travellers alike.

Jun 1 2016-9

Jun 1 2016-7

Jul 6 2016-6

Jul 6 2016-3 (1)

IMG_1347

With the upgrading of the existing rooms and introduction of an additional floor, it was also time to revise the common areas of the building too. Over a year and a half ago, the Hilton Garden Inn Oakville underwent a main floor renovation. It is time for us to expand on the initial work that took place then. Marquee Group is currently exploring plans for a new fully upgraded and expanded bar, patio and  restaurant area.

While some ideas are still in planning phase, work has already taken place to upgrade existing common areas such as the pool. We have already removed existing flooring in this area and replaced it with brand new tile. In the coming months, new lighting and signage will be introduced as well. Below is a picture of the new pool tile.

May 12 2016 007

Stay tuned for more updates!

Comments are closed.